From: OCO_Export_Management <OCO_Export_Management@water.ca.gov>
Date: Thu, 13 Jan 2011 08:52:59 -0800
Subject: Delta Operations Summary for January 13, 2011

     
 PRELIMINARY DATA  
 SUBJECT TO REVISION WITHOUT NOTICE
      
 EXECUTIVE OPERATIONS SUMMARY ON 1/13/2011
      
 This summary can also be found at:
 http://www.water.ca.gov/swp/operationscontrol/docs/delta/deltaops.pdf
      
 SCHEDULED EXPORTS FOR TODAY
      
 Clifton Court Inflow = 7,500 cfs
 Jones Pumping Plant = 4,100 cfs
      
 State Water Project Informational Data can be found at:
 http://www.water.ca.gov/swp/operationscontrol/projectwide.cfm
 ESTIMATED DELTA HYDROLOGY
      
 Total Delta Inflow ~ 51,556 cfs
 Sacramento River     = 34,672 cfs
 San Joaquin River    = 13,733 cfs
      
 Data for previous 30-days is available at:
 http://www.water.ca.gov/swp/operationscontrol/docs/delta/DeltaWQ.pdf
      
 DELTA OPERATIONS  
      
 Delta Conditions     = Excess Condition
 Delta x-channel Gates = Closed
 Outflow Index        ~ 38,900 cfs
 % Inflow Diverted      = 16.2%(14-day avg)
 X2 Position          = 63.4 km
 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
 RESERVOIR STORAGES (AS OF MIDNIGHT)
 Shasta Reservoir     = 3,398 TAF
 Folsom Reservoir      = 411 TAF
 Oroville Reservoir   = 2,277 TAF
 San Luis Res. Total   = 1,709 TAF
 SWP Share  = 895 TAF
      
 Reservoir data and reports are available at:
 http://cdec.water.ca.gov/reservoir.html
      
 Reservoir Releases
 Keswick              = 8,000 cfs
 Nimbus               = 3,700 cfs
 Oroville             = 1,750 cfs
 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
 Provisional Old River & Middle River Flows (as of 1/12/2011)
 Based on USGS stations 11312676 & 11313405 via CDEC available at:
      
 14-Day Running Average = -4189 cfs
 5-Day Running Average = -3831 cfs
 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
 Turbidity Monitoring available at:
 http://www.water.ca.gov/swp/operationscontrol/docs/delta/DeltaMisc1.pdf
      
 Prisoners Point (3-day average) = 13.2 NTU
 Holland Cut (3-day average) = 7.8 NTU
 Victoria Canal (3-day average) = 12.0 NTU
 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
 Delta Smelt Expanded Salvage Data for WY 2011:
                                         CVP SWP Total
 Daily total  -------------------------> 0 0 0
 Monthly total (January) -------------> 0 0 0
 Season total of each facility ----------> 0 0 0
 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
 Cumulative Concern Level for Adult Delta Smelt: 1087
 Cumulative Take Limit for Adult Delta Smelt: 1630
 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
 Longfin Smelt Expanded Salvage Data for WY 2011:
                                         CVP SWP Total
 Daily total  -------------------------> 0 0 0
 Monthly total (January) -------------> 0 0 0
 Season total of each facility ----------> 0 0 0
      
 Winter Run Chinook Salmon Estimated Loss Report available at:
 http://www.usbr.gov/mp/cvo/vungvari/salmondly.pdf